Due to early water incursion, the well is currently
producing around 50 barrels of oil per day and
0.5 million cubic feet of gas per day. Testing of
another zone which was the main target of this
well is under evaluation and tested at later stage.
At Tal block, (operated by MOL, where POL has a
pre-commerciality share of 25%), Development
well Makori Deep-02, as a result of Drill Stem Test
(DST) conducted at the well to test the potential
of Lockhart formation, the well has tested 1,844
barrels per day of oil and 18.25 mmscf of gas
per day at 32/64” fixed choke size at the flowing
wellhead pressure of 3,767 psi. Makori Deep-2
well was connected to the production line as on
November 19, 2019. Due to water incursion the
well is presently producing around 850 barrels
of oil per day and 8.38 million cubic feet of gas
per day. Mardankhel-3 has also been connected
to the production line on July 05, 2019 and
presently producing around 9.58 million standard
cubic feet of gas per day and 240 barrels of
oil per day. Mardankhel-4 location has been
approved.
At Adhi field (operated by Pakistan Petroleum
Limited, where POL has 11% share).
Adhi-33: After fracturing job, well is producing
200 barrels of oil and 3.15 million cubic feet of
gas per day at plant.
Adhi 34: Drilling of well has been completed and
after testing is producing around 46 barrels of oil
per day and 0.4 million cubic feet of gas per day.
Adhi South-4: Well tested and is currently
producing 1,160 barrels of oil and 1.12 cubic feet
of gas per day at plant.
Adhi South-3: Well tested and producing around
789 barrels of oil per day and 0.618 million cubic
feet of gas per day.
Adhi South-2: Well tested and producing around
781 barrels of oil per day and 0.69 million cubic
feet of gas per day.
At Jhal Magsi (Operated by OGDCL, where POL
has 24% share), work has been stopped as
decision regarding laying of pipeline by SSGCL is
not finalised.
At Ratana field (operated by Orient Petroleum
Inc., where POL has 4.545% share), on the basis
of 3D seismic data processing and interpretation,
Ratana-5 Well will be drilled to explore un-drained
compartment.
CHOKE Production
parameters
OIL
(Barrels per
day)
GAS
(Million Standard
Cubic Feet per day)
WATER
(Barrels per
day)
WHFP
(PSI)
20/64’’
Fixed
Minimum
655
2.57
220
2,850
Maximum
1,103
2.98
397
3,068
Average
832
2.76
330
2,951
Producing Fields
At Balkassar lease (100% owned by POL), Balkassar Deep-1, due to drilling challenges in salt
formation, further proceeding to the target depth was abandoned and testing of only upper zones is in
progress.
At Pindori Lease (operated by POL with a 35% share), drilling of Pindori-10 was commenced on
January 28, 2019 and achieved its target depth at 13,701 feet. As a result of Drill Stem Test (DST)
conducted at the well to test the potential of Lockhart Formation, the well has tested the following
hydrocarbons:
EXPLORATION AND
DEVELOPMENT ACTIVITIES
44
PAKISTANOILFIELDS LIMITED