Page 56 - Pakistan Oilfields Limited - Annual Report 2020

Basic HTML Version

• Total patients treated during the year at Free
dispensary Meyal : 1,002
During the year the Company set up several free
medical camps for the community, around 1593
patients were treated at Pindori, Pariwali, Sipyal,
Jhandial and Dhullian fields.
Helping our Environment
We are committed to minimize and manage
environmental impact of our operational activities
on our employees, contractors, surrounding
neighborhood and earth’s resources without
affecting ecosystem. In view of our continual
environment friendly activities, POL has achieved
ISO 14001:2015 certification for LPG plant site at
Meyal.
The mitigation measures taken to neutralise
environmental impact include technology, up
gradation of systems, increased monitoring
level of environmental parameters, applicable
legislative controls, good industrial practices and
waste management.
Projects Completed
• Recertification and migration audits of ISO
45001:2018 for Meyal, Balkassar.
• Surveillance & migration audit as per ISO
45001:2018 for POL SCR Rig.
• Surveillance audits of ISO 14001:2015 for
LPG plant Meyal.
• Surveillance audit of ISO 45001:2015 for
Khaur Facilities.
• Environmental monitoring of all POL fields and
SCR rig.
• Initial Environmental Examination for
Balkassar Deep-1, DG Khan-1 and Jhandial-2
well, Turkwal 3-D seismic survey.
• 3rd party hydro testing for internal cartridge
Fire extinguishers and SCBA cylinder have
been carried out first time in POL history.
• HSE annual awards in all POL fields/SCR Rig.
• Fire & Safety equipment with new wash tank
(Joyamair).
• Fire and Safety gap analysis carried out for
POLGAS (Karachi)
• Completion of environment projects at Meyal,
Khaur, Balkassar & Joyamair.
• AED for POL house Morgah, Joyamair and
Turkwal fields.
Ongoing/New targets
• Procurement of new fire truck for Khaur field.
• Surveillance audits of ISO 45001:2018 for
Meyal, Balkassar
• Surveillance audit as per ISO 45001:2018 for
POL SCR Rig
• Surveillance audits of ISO 14001:2015 for
LPG plant Meyal
• Environmental monitoring of all POL fields and
SCR rig.
• H2S level-II training through external trainer.
• Process Safety Management training
(Propose plan).
• Conduction of in house first aid training at all
fields/SCR Rig.
• Emergency staircase installation at POL
House, Morgah, Rawalpindi.
• Obtain central certificate ISO 45001:2018 for
all certified fields/SCR rig.
• EIA study for Pirani D-1 and Bhandhak-1 wells.
• HSE performance of Fields’ staff for annual
award will be conducted in all POL fields/SCR
Rig.
• Clean agent fire protection system installation
at solar power system for POL House, Morgah,
Rawalpindi.
54
PAKISTANOILFIELDS LIMITED